Boyce, Graybeal & Sayre, Inc. has completed over 800 projects since its incorporation in 1996. Here is a listing of stone and aggregate projects from the past 12-18 months:
- Sampler Installation
- (3) Conveyors & Tower
- Blending Tunnel Repairs
- Emergency Work - Bin Repair
- Tertiary Crushing Station Tie Wall
- Crusher Bin Replacement, C-3 Conveyor Installation
- Relocate Existing Stacker, New Transfer Belt, Concrete
- Plant Repair and Tunnel Work
- Radial Stacker
- Engineering - Tunnel Remediation
- Crusher Feed Bin Fabrication
- Primary Station Fabrication & Erection
- Reline Feeder at Primary
- Screen Installation
- Engineering - Primary Surge Pile
- Engineering - Secondary Primary
- Engineering - Installation of 25' Teledyne Rock Breaker
- Engineering - Replace Screens
- Engineering - Wet Screen
- Emergency Work - Replace Tail Pulley
- Pump Installation
- Conveyor Demolition / Conveyor Installation
- Repair Underground Transfer
- Conveyor C-3 Concrete Foundation
- Replace (2) Stacking Conveyor Cables
- Steel Replacement
- Repair Radial Stacker
- Install Skirtboards & Dust Cover
- Conveyor Upgrade
- Screen Rebuilds
- Change Screen Top Deck
- Install Corrugated Pipe
- Reposition Existing Feeder
- Repair Stacker & Walkway
- Conveyor Installation
- 8 x 24 Screen Installation
- Remove & Reinstall 7' Standard Crusher
- Pugmill Installation / Maintenance
- Truss Replacement
- Blending Tunnel Rebar Repair
- Fabricate Screen Access and Skirts
- Conc. Foundations - ScreenTower, HP-700 & Surge Bin
- Fabricate & Deliver Sieve Bend Chutework
- Engineering - Rail Unloading Pit
- Replace Chutework & Gate on Slope Belt
- Labor Assistance
- Jaw Crusher Maintenance
- Conveyor Repairs
- Engineering - 8 x 24 Triple Deck Screen
- Fabricate 100 Slope Arch Supports
|
|